Skip to main content

Pulse

Pulse is a collaborative benchmark intelligence workspace. You pick finished benchmark runs from across your team's projects, save them as a named View, and explore the combined results through charts and tables in one place. You do not have to open each project.

Navigate to Pulse in the left sidebar (/pulse).

Core concepts​

Run - one benchmark job that finished as completed or partial: one scenario, one model, one hardware target, and one tool. Pulse lists runs from the Team projects of your organization, plus the private projects you choose to include. Demo projects are not listed.

View - a named snapshot of runs. A View holds the runs you chose when you saved it. It does not add new runs by itself. You explore, share, and save a View as a unit.

Curator - the tab where you find runs and save them as a View.

Lens - the tab where you read the charts, tables, and quality reports of the open View.

The two tabs​

The workspace has two top-level tabs. Curator builds a View from runs. Lens reads a View.

When you open Pulse, it shows the last View you opened, if that View still exists. Otherwise it opens the Curator if you can build Views, or the Lens if you cannot.

Curator tab​

The Curator tab is visible to workspace members with write access to Pulse. The left panel lists your saved Views. The main area lists every run you can add to a View.

If you have no Views yet, a short guide at the top of the Curator shows the three steps: find runs, select them, and save them as a View.

Lens tab​

The Lens tab shows the open View. If no View is open, the Lens asks you to select one from the View List.

The View List​

The left panel in both tabs lists your saved Views. Pinned Views appear first, sorted in your chosen order. Unpinned Views follow alphabetically.

  • Click any View name to open it in the Lens.
  • Pinned Views can be reordered by drag-and-drop or by using the up/down arrow buttons on each row (keyboard-accessible).
  • A pin icon appears next to pinned View names.

Finding runs in the Curator​

The filter bar at the top of the Curator narrows the run table.

ControlWhat it does
Search boxEach word you type must match the project, run, workload, scenario, tool, model, engine, machine, status, or date of a run. A run number or run ID also matches. Press / to move to the search box, and press Escape to clear it.
Workload chipsOne chip per benchmark tool, with the number of matching runs. Select one or more chips to show only the runs of those tools.
StatusShows only runs with the statuses you tick, such as completed or partial.
DatesShows only runs created between the From and To dates. Dates are in UTC.
ProjectShows only runs of the projects you tick. A search box helps you find a project.
  • The counts beside each choice reflect the other filters that are on.
  • The Cmd+K palette offers Search Pulse runs, which moves you to the search box.
  • Each active filter appears as a chip under the filter bar. Select a chip to remove that filter, or select Clear all.
  • To include runs of your own private projects, open Private projects and select each project to include. The list loads when you open it.
  • Under Group by, choose None, Workload, or Project. Each group shows its run count across all pages.

The run table shows one row per run, with the columns Run, Project, Workload, Model, Engine, Machine, Status, and Date. A run from a private project shows a Private label. Columns leave the table as the panel gets narrower.

Selecting runs​

  • Tick the box on a row, or click the row, to select a run.
  • Your selection stays when you change pages or filters.
  • To select every run of a project, set Group by to Project and tick the box in the project's group header. Select all takes at most 5,000 runs. If a project has more matching runs, narrow the filters and try again.
  • While runs are selected, a bar at the bottom of the Curator shows the count and offers Clear, Add to view, and Create view.

Creating a View​

  1. Go to the Curator tab.
  2. Find and select the runs you want.
  3. Select Create view in the selection bar, or in the View List.
  4. Enter a name and, if you want, a description. Select Create.
  5. The View is saved and opens in the Lens.

You must select at least one run before you can create a View. The Cmd+K palette also offers Create view from selection.

Views built from whole projects​

When you select every run of a project with no search or filter on, the View records that project as a source. Later, the owner of the View can check the source projects for runs that the View does not hold yet. If a search or filter was on, Pulse selects only the matching runs and does not record the project as a source.

Adding runs to an existing View​

  1. Select runs in the Curator.
  2. Select Add to view in the selection bar.
  3. Choose one of the Views you own. Runs already in the View stay, and nothing is removed.

The result says how many runs were added, how many were already in the View, and how many could not be added because you cannot see them.

Checking a View for new runs​

A View is a snapshot, so new runs of its projects do not appear in it by themselves. When a View was built from whole projects, its owner sees Check for new runs under the View name.

  1. Select Check for new runs.
  2. Pulse lists how many runs of the source projects are not in the View. If there are more than 5,000, Pulse lists the first 5,000.
  3. Select Add to add them. Nothing is added until you do.

The Cmd+K palette offers the same action as Pulse: Check for new runs.

Editing a View's runs​

  1. Open the View in the Lens.
  2. Select Edit jobs in the View toolbar.
  3. The Edit view dialog opens with the runs of the View already selected. You can search and filter the runs in the dialog.
  4. Tick or untick runs, and change the name or description if needed.
  5. Select Save.

A save removes only the runs that you can see and unticked. Runs that are hidden from you stay in the View.

Renaming a View​

  1. Open the View in the Lens.
  2. Select Rename in the View toolbar.
  3. Type the new name in the dialog and confirm.

What the Lens shows​

When a View is open in the Lens you will see, from top to bottom:

View toolbar​

The header shows the View name, its description, and a snapshot line, such as "Snapshot of 12 runs, taken Oct 13, 2026. Last updated Oct 14, 2026." The dates are in UTC. If some runs of the View are in private projects that you cannot see, the line says how many are hidden from you.

The header also shows a row of action buttons. The buttons available to you depend on your permissions for this View:

ActionWhat it does
RenameRenames the View in a dialog.
Edit jobsOpens the Edit view dialog to change which runs are in this View.
ShareOpens the Share dialog to invite specific email addresses.
Pin or UnpinPins or unpins the View to the top of your View List.
Publish or UnpublishMakes the View publicly accessible via a shareable link, or makes it private again.
CopyDuplicates the View under a new name.
CSVDownloads all benchmark results in this View as a CSV file.
DeletePermanently removes the View.

A Published badge appears on the toolbar when the View is public. A Pinned badge appears when it is pinned. A badge such as 3 hidden shows how many runs are hidden from you.

Filter bar​

Below the toolbar is a filter bar that narrows the charts and table to a subset of the runs in the View. Filters available in Pulse:

  • Model
  • Framework
  • Hardware label
  • Tool
  • Concurrency
  • Input sequence length (ISL)
  • Output sequence length (OSL)
  • GPU count
  • Precision

Filters work across all sections in the Lens simultaneously. The charts, data table, and KYAI section all reflect the same active filters.

Charts​

Charts are organized into categories matching the Reporting page:

CategoryChart types included
ThroughputTokens per second vs concurrency, requests per second vs concurrency, total throughput
LatencyTTFT, TPOT, p50/p95/p99 latency vs concurrency
EfficiencyTokens per second per GPU, interactivity (output tokens per second per request)
QualityKYAI pass rate, quality score (when KYAI results are present in the View)
CostUSD per million tokens, tokens per dollar
Hardware utilizationGPU utilization, GPU power, GPU memory, CPU utilization, system power

Each category header is collapsible. You can collapse sections you are not interested in to focus on what matters for your current comparison.

Charts in Pulse use the same rendering as the Reporting page, so results look familiar if you have used Reporting before. When a View contains runs across multiple workloads, the charts show each workload as a separate section, labeled with the workload name and tool type. This makes it easy to compare, for example, a vLLM workload and a SGLang workload for the same model on the same hardware side by side.

Data table​

Below the charts is a Data Table showing one row per run in the View. The table includes the same columns as the Reporting page: model, framework, hardware, scenario, throughput, latency, cost, and quality metrics. You can sort by any column.

KYAI section​

If any of the runs in the View are linked to a KYAI evaluation run, the KYAI section appears below the benchmark data. It shows the quality evaluation results for those runs: judge scores, pass rates, sample-level details, and truncation warnings.

Sharing a View​

Share by email​

  1. Open the View in the Lens.
  2. Click the Share button in the toolbar.
  3. Enter one or more email addresses in the input field (comma or space-separated).
  4. Click Send invitations.
  5. The recipients receive an email with a direct link to the View.

Shared users can view the View and its data. Only the owner of a View can edit, rename, share, publish, or delete it.

To revoke a share, open the Share dialog again. Existing shares are listed below the email input. Click the X next to any share to remove it.

Publish a View​

Publishing makes the View accessible to anyone with the link, inside or outside your workspace, without requiring them to be logged in.

  1. Open the View in the Lens.
  2. Click the Publish button in the toolbar.
  3. Confirm the action. A Published badge appears and a shareable URL is shown.

To unpublish, select Unpublish. The View becomes private immediately and the shareable link stops working.

Note. Only the owner of a View can publish or unpublish it.

Pinning a View​

Pinning a View moves it to the top of your View List. Pinned Views appear before unpinned Views and are reorderable by drag-and-drop or keyboard arrows.

Select Pin or Unpin in the toolbar.

Copying a View​

Click Copy in the toolbar to duplicate the View. The copy gets the name Copy of <original name>. It starts unpinned and unpublished and contains the same runs and filters as the original. It also keeps the Team projects the original was built from, so you can check the copy for new runs. You own the copy and can edit, share, or delete it independently.

Downloading as CSV​

Select CSV to export all benchmark result rows in the active View (after filters are applied) as a comma-separated file. The exported file contains the same columns shown in the data table, plus additional raw metric columns not shown in the table by default.

The filename is based on the View name and the current date.

Permission model​

Who can do whatWrite access to PulseRead-only access
Open Pulse and view ViewsYesYes
See the Curator tabYesNo
Create ViewsYesNo
Edit, rename, delete, share, or publish a ViewOnly Views they ownNo
Pin ViewsYesYes (pin for themselves)
Download CSVYesYes

Write access to Pulse is granted at the workspace level by a workspace admin.

Tips for effective Pulse use​

  • Narrow your selection in the Curator. A View with 200 runs is hard to read. Aim for 5 to 20 runs per View, grouped around a specific question: "vLLM vs SGLang on this model" or "How does this hardware scale with concurrency?"
  • One View per question. Pulse works best when each View has a clear purpose. Name it to reflect that purpose: Llama 4 Scout - throughput comparison is more useful six months from now than Test view 3.
  • Combine performance and quality. If you have run a KYAI evaluation alongside your benchmark runs, include the KYAI runs in the same View. The KYAI section in the Lens will appear automatically alongside the performance charts.
  • Share before the meeting. Use Publish or Share-by-email to send a View to teammates before a design review or planning session. They can explore it in the browser without needing a Metrum AI Bench account (if published publicly) or with just a team invitation.
  • Use filters in the Lens. If a View spans multiple concurrency levels or ISL values, apply a filter in the Lens to focus a single dimension at a time. The charts update immediately.